Free tool · 03
Factory Visit Checklist
Ten sections to work through during a supplier visit. Print it, write on it, and keep the notes with your quotation file. A Word version is available if you prefer to type.
ChinaSourcing
Factory visit record
This is a buyer preparation checklist, not a professional factory audit report. It does not replace an independent inspection, a compliance assessment or legal advice.
- Date and time
- Factory name
- Address
- Buyer / company
- Product(s) reviewed
- Order value under consideration
01 Company information
- Legal company name (as on the business licence)
- Business licence number and registered address
- Factory address — confirm it matches the licence
- Contact person, role, phone, WeChat
- Year established and number of employees
- Main products and export markets
- Manufacturer or trading company?
02 Documents to request
- Copy of the business licence
- Export licence or registration, if applicable
- Certification relevant to your product and market
- Test reports for the exact model you intend to order
- Recent inspection reports, if any
- Bank account details in the company name
03 Production equipment and capacity
- Main machines and their condition
- Number of production lines
- Monthly capacity and current utilisation
- Which steps are in-house and which are outsourced
- Tooling and mould capability
- Peak season constraints
04 Quality control
- Dedicated QC person or team?
- Incoming material checks
- In-process checks and recorded results
- Final inspection before packing
- Defect rate and how it is measured
- How customer complaints are handled
05 Sample consistency
- Compare production sample with the approved sample
- Ask to see three units of the same item side by side
- Check colour, finish, dimensions and weight
- Confirm which sample becomes the production reference
06 Packaging
- Unit packaging and retail readiness
- Inner box and carton dimensions
- Carton strength and stacking
- Packing area cleanliness and method
- Labelling, barcodes and shipping marks
07 Delivery schedule
- Lead time for the first order
- Lead time for repeat orders
- Production planning method
- What happens when a material is delayed
- Chinese New Year and holiday shutdown dates
08 Certifications and compliance
- Which certifications apply to your product and market
- Who holds the certificate — factory or trading company
- Whether the report covers your exact model
- Who pays for additional testing
- Labelling and language requirements
09 Commercial terms to confirm
- Unit price and currency
- MOQ per model and per colour
- Incoterm and named port
- Payment terms and deposit percentage
- Sample cost and whether it is credited
- Warranty and remedy for defects
10 Risk signals to note
- Address on the licence does not match the factory you are standing in
- Cannot show a business licence, or shows a different company name
- Refuses a video call or a visit, and only communicates through a marketplace chat
- Prices far below every other quote on the same specification
- Certificate shown is for a different model, or in another company name
- Sample is excellent but production is outsourced to a different workshop
- Pressure to pay a large deposit to an account that is not the company account
- No written quotation, only a WeChat message with a number
- Answers about lead time or capacity change between conversations
- Unwilling to name a reference customer or show a shipping document
11 Communication notes
- Main contact after the visit
- Preferred channel — WeChat, email, both
- Response time observed during your visit
- Language and translation arrangements
- Photos taken (with permission) and what they show
Summary after the visit
What impressed you
What concerned you
Next step (sample, quotation, second visit, decline)
Verified by
Date
Generated by ChinaSourcing. Free to use and share. Information is general and does not constitute an audit, certification or legal advice.
What to do with the numbers
The toolkit works as a sequence 01 Supplier comparison sheet Put every quote on the same basis — same Incoterm, same quantity, same currency. Open → 02 Cost calculator Turn a unit price into a landed cost per unit, including freight and your own duty figure. Open → 03 Trip planner Decide which cities to visit and how many days each one needs. Open →